SUNDRIES_1994_0038
- Name
- SUNDRIES_1994_0038
- Date
- 2/7/1994
- Category
- Sundries
- Keywords
- Response to Awaiting Report Item Number One, regarding the status of the construction of a pedestrian footbridge over the railroad tracks in North Cambridge; Response to Awaiting Report Item Number Six, regarding reducing the speed limit or trains travelling between Porter Square and Alewife; and Response to Awaiting Report Item Number Eight, regarding gathering information of the Railroad Safety Committee.
- Year
- 1 994
- Media
-
SUNDRIES_1994_0038.pdf
